Vacuum Pump Installations

We supply and install new vacuum pumps and complete pumping systems across the UK — from single rotary-vane swap-outs to multi-pump central vacuum and CMVS installations. Mechanical and electrical fit, commissioning, performance test, operator handover, and a documented installation file.

What is installations?

Vacuum pump installation is the supply, mechanical and electrical fitting, commissioning, and performance verification of a new vacuum pump or pumping system at the customer's facility — including pipework connection, electrical isolation, controls integration, and operator handover.

Response time

Site survey within 1–2 weeks of enquiry; installation date depends on pump lead time and customer site availability.

Standards
  • Mechanical installation per manufacturer recommendations
  • Electrical installation by competent persons (UK BS 7671)
  • Commissioning records issued per pump
What's included

What you get with installations

Site survey

Pre-installation visit to confirm location, electrical supply, exhaust route, cooling, and any control or interlock requirements.

Pump supply

New OEM pump supplied to the agreed specification — Edwards, Leybold, Busch, Becker, Elmo Rietschle, or as specified.

Mechanical fit

Pump mounted, pipework connected (ISO-K, KF, NW or NPT as appropriate), exhaust routed, gas-ballast valve plumbed, vibration isolation fitted.

Electrical fit and controls

Power connection through the customer's isolator, control wiring to existing tooling or new VFD, interlocks integrated where required.

Commissioning and performance test

Initial run, leak check, ultimate vacuum measured at the pump and at the use-point, pumping speed verified.

Operator handover and installation file

Walkthrough with site personnel, installation file (datasheet, electrical certificate, leak-test results, recommended service intervals), warranty registration.

How it works

From booking to handover

  1. 1

    1. Specification and quote

    Tell us the application — process, vacuum level required, gas type, duty cycle. We size the pump and quote supply + installation.

  2. 2

    2. Site survey

    Pre-installation visit to confirm location, services, and any specific site requirements.

  3. 3

    3. Order and lead time

    Pump ordered. Lead times depend on the model — common rotary vane models are usually ex-stock; specialist semiconductor or analytical pumps may be 2–6 weeks.

  4. 4

    4. Installation

    Pump delivered to site and installed by our engineers, typically a one-day visit for a single pump, multi-day for central systems.

  5. 5

    5. Commissioning

    First run, leak check, performance verification, and operator handover.

  6. 6

    6. Service plan

    Recommended service intervals scheduled into your maintenance calendar; first service typically 100h after installation.

When to use

When you'd typically need installations

Common scenarios where customers ask for this service. If your situation isn't listed but sounds related, get in touch — we can advise.

  • Replacing a worn-out pump that's beyond economical refurbishment
  • New process line requiring vacuum supply
  • Upgrading from oil-sealed to dry technology (cleanroom, food, pharma)
  • Adding redundancy to an existing single-pump installation
  • Central vacuum system installation across multiple use-points
Brands & equipment supported

Equipment we work on

  • Edwards — primary distributor partner; full product range
  • Leybold, Busch, Pfeiffer, Becker, Elmo Rietschle as required
  • Specialist suppliers for semiconductor, analytical, or aerospace applications
Frequently asked questions

Common questions about installations

Both options are available. If you have a pump model already specified by your process engineer, we'll supply and install it. If you only know the application, we'll size the pump based on chamber volume, target vacuum level, gas type, and duty cycle.

Need installations?

Tell us your pump model, application, and timing and we'll come back with a quote and confirmed availability.